Pasquill supplies striking vaulted Timber Frame Extension at holiday home
Project information
- Building description:
- Timber frame extension project
- Location:
- Cornwall
- Client:
- Seven Bays Park
Products used
-
Cut rafters
-
Timber Frame Extension Kit
Services used
-
Design
-
Express Delivery
-
Manufacture
Project details
The precision-built, pre-manufactured timber frame system provides the structure of an extension – ready to be personalised with a choice of external cladding and roofing finish.
When considering the extension, Seven Bays Park was flexible with the cost of their project as it had a specific image in mind for how the build would look. However, it needed a reasonably cost-effective solution, and we were able to provide this in comparison to the first supplier the client approached.
Pasquill, the largest supplier of trussed rafters in the UK, has supp a bespoke Timber Frame Extension with a striking vaulted ceiling at the newly extended office of a holiday park in Cornwall, doubling the size of the original build.
Seven Bays Park chose us for this project due to our proven track record, showcased by its positive reviews and involvement in award-winning projects. The client was looking for a reliable timber manufacturing company after their first company had let it down after entering the design phase.
Taking over from another company posed a few challenges, including an unfinished first design. After receiving this version, our team quickly got to work on finishing the design with new structural calculations. This was completed in a matter of days and shared with the client for them to supply their input. We had to reassess the best materials to use for the project by providing a breakdown of the products and range the client could use.
We also provided the client with sustainable-sourced timber. The company’s timber frame components are manufactured from sustainable timber supplied by FSC® Certified and PEFC-approved sources. Once built, a timber extension can offer a high level of insulation and airtightness, making it a great choice for any project.
Thanks to a one-load delivery and one-day construction time, disruption was minimal. The build went incredibly smoothly, especially when considering the complexity of the vaulted roof design and met all relevant efficiency and sustainability regulations for the final project.